well,

I have my assessment tomorrow,

domestic re-wire,

plastic enclosed isolator front end,

plastic enclosed 100mA TD with 63A MCB,

plastic CU understairs,

designed in 2008,

almost finished in 2016,

wonder how it will go,  :C
best of luck, pity the poor assessor, go easy on him/her.

 
I did change the 60898 C40 feeding the 6mm T&E/10mm SWA to the shed though, stuck a C32 SP RCBO on it to keep it smooth,  :D

and disconnected the rods, cant be having the man all confused as to what sort of earthing localised PME actually is, now, can we?  :C

oh, that reminds me, need to head to the downloads section and see if there are any RAs there,  :|

 
well,

I have my assessment tomorrow,

domestic re-wire,

plastic enclosed isolator front end,

plastic enclosed 100mA TD with 63A MCB,

plastic CU understairs,

designed in 2008,

almost finished in 2016,

wonder how it will go,  :C


wish i was there for see that

is your design to 16th or 17th?

(as a side note, will you be required to show a copy of the regs you designed it to along with current?)

 
Last edited by a moderator:
wish i was there for see that

is your design to 16th or 17th?


16th, 

got the house xmas 2007 [literally, last working day], had to have it livable by 6th Jan 2008,

just finished upstairs lights last month, still got porch and living room light to do, and more sockets in main bedroom.

wish i was there for see that

is your design to 16th or 17th?

(as a side note, will you be required to show a copy of the regs you designed it to along with current?)


not sure ,

they have already been told I DONT have the amd3 regs,  apparently thats fine,   :C as long as my OSG is the same version of my regs book or newer,,,   WTGrape?

I have a BRB anyway, but no idea where the matching OSG is,,,,,

 
I didn't know we had to colour co-ordinate our Regs and OSGs  :C          I've got matching screwdrivers  but my sidecutters don't match my pliers  ...am I still allowed to work ?

Oh and I have a ticket for Steptoe's first assessment ....didn't you know he was selling them ? 

 
well,

I have my assessment tomorrow,

domestic re-wire,

plastic enclosed isolator front end,

plastic enclosed 100mA TD with 63A MCB,

plastic CU understairs,

designed in 2008,

almost finished in 2016,

wonder how it will go,  :C


As far as I am aware assessments are a review of a sample your work from the past 12 months, (i.e. since your last annual assessment), and as work installed during 2015 could still be fully compliant with all plastic CU's etc  (421.1.201 did not become fully implemented until Jan 2016 as per Note2). The expectation for metal CU's would not become an issue until assessments from Jan 2017 onward.

Doc H.  

 
How did it go?

well,

I have my assessment tomorrow,

domestic re-wire,

plastic enclosed isolator front end,

plastic enclosed 100mA TD with 63A MCB,

plastic CU understairs,

designed in 2008,

almost finished in 2016,

wonder how it will go,  :C
 
How did it go?


It went well,

I used a 3signature cert as the design date was to a different amd, 

He never made any issue, apart from it was probably the longest rewire he'd ever heard of and still not finished after 8years, :eek:

One of the random certs happened to be an unsatisfactory PIR, he would have coded one of the faults different,  but that was it, I explained my reasoning for the code I gave and he seemed happy enough.

Oh, and I needed a lock-out kit that actually worked,,,,,, 

 