I am new to this forum and have a query on an upcoming installation and was looking for reassurance on the following selections from the experts out there or just thoughts in general...
Installation is for 5 x Dual EV Chargers ( 2 x 32a 7.4Kv Per pedestal & Single Phase)
10mm 3 Core SWA from EV Chargers to Schneider 250a 3p+n switch disconnector (40m each run in 2 x underground ducts with 6 in one and 4 in the other)
Board has 10 x 32a Scneider type C spread across the phases (L1 = 3, L2 = 3, L3 = 4)
Board to main Switch is 4 core and a 50mm earth over 80m to a Scneider Compact NSX set for 140a (Cable clipped on vented tray throughout)
Underkill/Overkill..??
Cheers
I am new to this forum and have a query on an upcoming installation and was looking for reassurance on the following selections from the experts out there or just thoughts in general...
Installation is for 5 x Dual EV Chargers ( 2 x 32a 7.4Kv Per pedestal & Single Phase)
10mm 3 Core SWA from EV Chargers to Schneider 250a 3p+n switch disconnector (40m each run in 2 x underground ducts with 6 in one and 4 in the other)
Board has 10 x 32a Scneider type C spread across the phases (L1 = 3, L2 = 3, L3 = 4)
Board to main Switch is 4 core and a 50mm earth over 80m to a Scneider Compact NSX set for 140a (Cable clipped on vented tray throughout)
Underkill/Overkill..??