doesnt have to be 50mm below the surface if its mechanically protected... stick it in a bit of galv conduit
+1. Thought it was just me did that:doesnt have to be 50mm below the surface if its mechanically protected... stick it in a bit of galv conduit
I was one of those, for two local councils.Why not REALLY bait him and cut a new DIAGONAL chase in ensuring the cable is below 50mm from the surface! He'd probably then try and get you under Part A Structural as in depth of chase / thickness of wall etc!
When Part P first came in there were (obviously still are) lots of instances of BCO's querying the work of perfectly competent sparks who were in the right. Things like a new extension would be built and the BCO would insist on the sockets and switches being put in to Part M heights...........or that and the rest of the lounge / through diner was changed to match etc. Basically they thought Part P gave them all these new powers to comment even though they themselves had no electrical training. Because of the "pressure" of the job and potential delays many sparks caved to the silly demands.
It came to a head locally to me when there were multiple grumblings, follow up queries & complaints from sparks in writing, questioning the BCO's credentials etc. I happen to know the now Principal Building Control Surveyor from 30 years back (used to do my extension plans for me and a mate when he was in the private sector working for himself) so can always phone outside of the normal channels. Give them their due they acknowledged their lack of training and understanding. So..........what they did was to employ the councils own preferred NICEIC electrical contractor at THEIR, the council's cost. When there was anything electrical the subbie would go out ACTING as a BCO for the day.
You stop and think "Surely they would be better to train someone up......or take on somebody experienced?". But then these days they probably see subbing it as the better option.I was one of those, for two local councils.
Most BCO's I deal with fully rely on myself being competent. I have actually converted quite a few!! For instance I pointed one BCO to the actual fact that for a normal 30 minute fire rated ceiling, the installation of non fire rated fittings do not have any significant detrimental effects. The research is there, and it was even published in the magazine for building inspectors!
You must always know the regulations you are working to, and be prepared to stand your corner in defence of your work.
Go "More Reply Options" then "Choose File", "Attach This File" then "Add To Post".........might have to re-size if too large or use Photobucket etc.Builders took some pictures today for me to send to inspector. So thought I would share
Only thing is I'm not sure how to upload a pic. Please help me
Builder took the picture so not the greatest, but shows what I'm trying to explain,
There was two more pictures but it wouldn't let me upload them, which show the cooker outlet to the right (which is in the picture) being feed from the isolator also to the right above the work top (not in picture)
I will let you know the outcome, hopefully find out tomorrow!!!! After he has spoken to his teacher friend.
Enter your email address to join: