I was just thinking back to when we had to do fixings with the dreaded Rawlplug Jumper Bit Tool ....it was 3/4" imperial conduit that came in lengths of 12ft 6" ( 4 mtr + )
Can't remember how much we fixed in a day seeing as it took about 10mins to fix a saddle !!!!
BUT I do remember when percussion drills arrived , Metric conduit arrived and doing new schools , hospitals & industrial we were fixing about 40 mtrs a day of surface tube incldg. all cutting , threading , setting etc.
Just seemed that no one was too bothered as we all tapped & twisted away with the Rawlplug Tool but once hammer drills were introduced , greater productivity was required.
Just thinking back .
Can't remember how much we fixed in a day seeing as it took about 10mins to fix a saddle !!!!
BUT I do remember when percussion drills arrived , Metric conduit arrived and doing new schools , hospitals & industrial we were fixing about 40 mtrs a day of surface tube incldg. all cutting , threading , setting etc.
Just seemed that no one was too bothered as we all tapped & twisted away with the Rawlplug Tool but once hammer drills were introduced , greater productivity was required.
Just thinking back .