Robin Spark
Well-known member
- Joined
- Aug 30, 2009
- Messages
- 1,425
- Reaction score
- 0
The outcome of this is that i now have made a note on the EIC that the water main bond was not verified but the electrical wiring is a farily new installation and the client is going to find out for me the actual position and whether its visible or not. He has got some future work for me to do soon at this location so I can have a look next time.
Thanks everyone for your input
Thanks everyone for your input