I was contracted to do some lights, needed a CU change due to requiring RCD protection, along with main bonding. All done but the existing lighting circuit isn't earthed up to scratch (High EFLI, needs a rewire in my opinion) but the customer won't get more work done, doesn't want the hassle and to spend the money. Should I just sign off the circuits that are up to scratch and tell the customer I can't sign off the lighting circuit?