This is my first post. Sorry if it's all stuff you've covered before.
On the new EICR form 5.1 is 'Identification of conductors'.
Having read what it says in the best practice guide, i.e. it no longer requires to be included, etc, do I just put a pass in this box even if switch wires, aren't marked.
What do you do?
I went back to the old PIR in frustration.
On the new EICR form 5.1 is 'Identification of conductors'.
Having read what it says in the best practice guide, i.e. it no longer requires to be included, etc, do I just put a pass in this box even if switch wires, aren't marked.