ianmacd
Well-known member
- Joined
- Mar 15, 2009
- Messages
- 3,877
- Reaction score
- 0
Had my surveillance visit yesterday afternoon. Passed but 2 things came out of it.
One is I need to do 2382 apparently. Its a new requirement ACAS has put on them so I am told. I have 12 months to do it before my next assessment.
The other is I taught the assessor something. He was not aware that Installation method C included cables embedded in masonry.
At least thats over for another year.
Last time he also suggested I think about joining the ECA but apparently they now require a level 3 NVQ to join. Guess they don;t want us 'quick spars' joining.
Ian.
One is I need to do 2382 apparently. Its a new requirement ACAS has put on them so I am told. I have 12 months to do it before my next assessment.
The other is I taught the assessor something. He was not aware that Installation method C included cables embedded in masonry.
At least thats over for another year.
Last time he also suggested I think about joining the ECA but apparently they now require a level 3 NVQ to join. Guess they don;t want us 'quick spars' joining.
Ian.