Hello everyone,
I've been looking through the forum for a few days now and come across great help for my AM2 that I started today.....
I started on my composite install and think it went well. I've got the pyro, motor to wire up, bonding of trunking and tray, emergency light and the heater left to do.
Was just wondering if anybody that has done the AM2 would know the answer to a couple of questions....
1) On the neon at the emergency light switch does the neutral and live link just go into the top two connections? I mean does it matter which connection does which?
2) What is the best way to label everything? I mean for example the lighting circuit do I jus put a label on, such as on 1 end of the cable put A and where it ends up put B? I just have never done labelling on things such as this before so a little stuck.
Apart from these couple of slight hitches it's going ok I think I had to use a coupler on the conduit stupid mistake though lol
Anyway I hope I can get a good reply but if not then thanks for reading the post and hope to get lots more info in the coming years. It really is a great site
Not looking forward to the pyro tommorrow lol
Thanks
I've been looking through the forum for a few days now and come across great help for my AM2 that I started today.....
I started on my composite install and think it went well. I've got the pyro, motor to wire up, bonding of trunking and tray, emergency light and the heater left to do.
Was just wondering if anybody that has done the AM2 would know the answer to a couple of questions....
1) On the neon at the emergency light switch does the neutral and live link just go into the top two connections? I mean does it matter which connection does which?
2) What is the best way to label everything? I mean for example the lighting circuit do I jus put a label on, such as on 1 end of the cable put A and where it ends up put B? I just have never done labelling on things such as this before so a little stuck.
Apart from these couple of slight hitches it's going ok I think I had to use a coupler on the conduit stupid mistake though lol
Anyway I hope I can get a good reply but if not then thanks for reading the post and hope to get lots more info in the coming years. It really is a great site
Not looking forward to the pyro tommorrow lol
Thanks