nicks electrix
Senior Member
- Joined
- Aug 2, 2009
- Messages
- 150
- Reaction score
- 0
Hi Forum.
First of all thanks to everyone who gave advise on 2391 exam, the wait is over and i passed. I m being assessed at the end of August and i have left my project a bit late. I was going to upgrade the fuse board in my house until today i realised it was a TN-S supply and the earth is +-4mm. what is the best way to get around this situation? Would the assessor be happy with an earth clamp on the lead sheath or not? I have done a lot of work but its all about 45min drive from my office/home.
Thanks
First of all thanks to everyone who gave advise on 2391 exam, the wait is over and i passed. I m being assessed at the end of August and i have left my project a bit late. I was going to upgrade the fuse board in my house until today i realised it was a TN-S supply and the earth is +-4mm. what is the best way to get around this situation? Would the assessor be happy with an earth clamp on the lead sheath or not? I have done a lot of work but its all about 45min drive from my office/home.
Thanks