HI WOULD ANYBODY KNOW IF I HAVE ENOUGH QUILIFACTIONS TO OPTAIN A JIB GOLD CARD??
City & Guilds 2360 Electrical Installation Part 1 and Part 2.
City & Guilds 2382 Level 3 the 17th Edition of the Wiring Regulations BS 7671
City & Guilds 2356 NVQ Level 3.
City & Guilds 2407 Level 3 Testing & Vefification of Electrical Installations (Ireland).
City & Guilds 3667 Level 2 Optical Fibre Internal.
City & Guilds 3667 Level 2 Optical Fibre External.
City & Guilds 2800 Instrumentation and Controls.
KNX Intelligent Building Control Systems.
ELA Award HV Switching.(Faraday center).
OPITO Approved Mist
OPITO Approved Bosiet
OPITO Approved Banksman
OGUK Medical
Compex will be completed end may
Would anybody know if i have enough quilifications to optain my "JIB GOLD CARD"??
City & Guilds 2360 Electrical Installation Part 1 and Part 2.
City & Guilds 2382 Level 3 the 17th Edition of the Wiring Regulations BS 7671
City & Guilds 2356 NVQ Level 3.
City & Guilds 2407 Level 3 Testing & Vefification of Electrical Installations (Ireland).
City & Guilds 3667 Level 2 Optical Fibre Internal.
City & Guilds 3667 Level 2 Optical Fibre External.
City & Guilds 2800 Instrumentation and Controls.
KNX Intelligent Building Control Systems.
ELA Award HV Switching.(Faraday center).
OPITO Approved Mist
OPITO Approved Bosiet
OPITO Approved Banksman
OGUK Medical
Compex will be completed end may
Would anybody know if i have enough quilifications to optain my "JIB GOLD CARD"??