Yes..put board on wall also....B Gas put new meter on...isolator in place alsoI assume they sealed the head do you have a picture.
Yes..put board on wall also....B Gas put new meter on...isolator in place alsoI assume they sealed the head do you have a picture.
Will get client to send some over and postShow us a pic we are all interested.
Yes, the DNO joint live LV service cables all the time. I have witnessed it many times on domestic new build supplies (including my own) and official DNO supply moves.I don't believe the DNO said this do they really believe someone jointed a live service cable it is a ridiculous suggestion.
Oh I know they do but an electrician on the verge of a breakdown.Yes, the DNO joint live LV service cables all the time. I have witnessed it many times on domestic new build supplies (including my own) and official DNO supply moves.
We were only there to check a possible dodgy socket which then led from one thing to another...why would you leave a job that is potentially dangerous just because you think you will get implicated in someway...calls were made everyone on site at the same time...issues rectified installation now safe...client will try to get there money back from guy who completed the worksSomething doesn't sound quite right with this whole story and it certainly suggests that some sort of cover up is involved. Definitely the sort of job you would walk away from to avoid being implicated in some way when the hits the fan
40 yrs in the game 3 x have come across installations powered up for many many years where link has been left out of cut out but sparks just connected to earth bar/ connection ( visually you can't tell ) without testing and the properties had NO earth but also twice same thing but old water pipe was acting as the earth so prob still never tested because the reading would have given the game away.It's done..DNO came...plate connecting earth to neutral was missing in the incoming head
Oh I know they do but an electrician on the verge of a breakdown.
The electrician who rewired the property said he new someone from manweb who will sort it as a foreigner....go figureThis is just my thoughts, but as somebody who like to play by the rules this all sounds very strange. Firstly, what is an electrician (presumably part of a CPS scheme) doing extending the DNOs cable - im sure this wouldn't be coved under his insurance or acceptable to his CPS supplier, and secondly, are you sure the DNO are happy to accept liability for work carried out by an untrained (not trained in their organisation ) person that they are unable to inspect?
Has it been confirmed that the installation is compliant for PME?
Come across it a quite few times where the old metalclad service head has been changed for a modern plastic one and the pilc sheath providing the TNS earth has not been connected to the earth block / terminal. There are some areas where TNCS supplies are not allowed by the DNO because of local ground conditions not being suitable.40 yrs in the game 3 x have come across installations powered up for many many years where link has been left out of cut out but sparks just connected to earth bar/ connection ( visually you can't tell ) without testing and the properties had NO earth but also twice same thing but old water pipe was acting as the earth so prob still never tested because the reading would have given the game away.
Enter your email address to join: