Hello everyone,
Just interested in peoples opinions on this one.
I was asked to do a periodic report for a company near me. The building is an industrial unit which is a depot for a large national food supplier. 1shed where vans are stored, around 20m by 10m and 2 small rooms serving as offices. Supply is 3 Phase, TNCS, tails into main switched fuse then into 3 p DB which contains 9 3 phase circuits (all refigeration van charger sockets) and 7 Single phase circuits (lighting, sockets in office etc. Shed is 7 metres high and though I was originally going to quote to supply access equip for lighting, it was agreed this was to be a limitation (testing to furthest accessible point).
I was recommended by my uncle who works there, to the manager of the depot (the guy requesting the work). However, he didn't even seem to know what the work would entail, so having explained all to my uncle in the initial phone call, I provided him with a little info pack I had put together on PIR's, as well as my quote which came out to
Just interested in peoples opinions on this one.
I was asked to do a periodic report for a company near me. The building is an industrial unit which is a depot for a large national food supplier. 1shed where vans are stored, around 20m by 10m and 2 small rooms serving as offices. Supply is 3 Phase, TNCS, tails into main switched fuse then into 3 p DB which contains 9 3 phase circuits (all refigeration van charger sockets) and 7 Single phase circuits (lighting, sockets in office etc. Shed is 7 metres high and though I was originally going to quote to supply access equip for lighting, it was agreed this was to be a limitation (testing to furthest accessible point).
I was recommended by my uncle who works there, to the manager of the depot (the guy requesting the work). However, he didn't even seem to know what the work would entail, so having explained all to my uncle in the initial phone call, I provided him with a little info pack I had put together on PIR's, as well as my quote which came out to