Hello all hope you are keeping well.
As my domestic knowledge is still slim to none I need a little info from your good selves.
I have recently moved into a flat that had no shower.
My flat mate bought a nice little mira shower and asked a "real sparK" to install it for him. The " real spark roughed in the cable and has never been seen again.
I have now decided that its about time the shower got installed but im confused about one part of the job
The shower will be fed from a wylex split load board. Both sides of the board have spare ways so what id like to know is,
Do i get an RCBO and put it at the RCD side of the board, an MCB and put it at the RCD side of the board or an RCBO and put it in the main switch side of the board, which is best practice???
As my domestic knowledge is still slim to none I need a little info from your good selves.
I have recently moved into a flat that had no shower.
My flat mate bought a nice little mira shower and asked a "real sparK" to install it for him. The " real spark roughed in the cable and has never been seen again.
I have now decided that its about time the shower got installed but im confused about one part of the job
The shower will be fed from a wylex split load board. Both sides of the board have spare ways so what id like to know is,
Do i get an RCBO and put it at the RCD side of the board, an MCB and put it at the RCD side of the board or an RCBO and put it in the main switch side of the board, which is best practice???