meady
Senior Member
- Joined
- Jun 19, 2009
- Messages
- 197
- Reaction score
- 0
Just finishing up my first full rewire quote and just wanted to run the costings over with some more experienced fellas
The house is a good sized 2 bed terraced house with extension on back, wooden floor boards on ground and 1st floor, no carpets and limited furniture. Half of the switch cables are run in conduit but half are plastered in so some chasing will be required.
I plan to install these circuits
downstairs lighting
downstairs sockets (radial)
kitchen socket (ring)
cooker
upstairs lighting
Upstair sockets (radial)
shower
smoke
I have costed all materials, everything from a dual rcd cu to consumables at
The house is a good sized 2 bed terraced house with extension on back, wooden floor boards on ground and 1st floor, no carpets and limited furniture. Half of the switch cables are run in conduit but half are plastered in so some chasing will be required.
I plan to install these circuits
downstairs lighting
downstairs sockets (radial)
kitchen socket (ring)
cooker
upstairs lighting
Upstair sockets (radial)
shower
smoke
I have costed all materials, everything from a dual rcd cu to consumables at