Hi,I would always use both MPPT trackers, assuming you have 2.
sorry to barge in on this thread, just wondering why its best to use both?
My installer is running 9 east panels to one inverter & 9 west panels to the other inverter (two flat roof areas - one with 12 panels/one with 6).
I was told the reason being splitting 9 (5 & 4 effectively) one of the strings would be too near the lowest input voltage of the MPPT and would be best running through one port?
Any thoughts, if you don't mind?
Hi-jacking posts causes confusion, I have given yours its own shiny new thread.
Last edited by a moderator: