Hi all
First post, so please be gentle.
I'm looking for a bit assistance on setting up a Sunny boy 3.6, specifically section 4 "Grid management service".
The system is a simple domestic install, a set of panels into the inverter and its tied to the grid. Nothing special.
This is the first time I've had to set one of these up, and I'll admit I'm a bit lost with some of the drop down options, as the screen shot below shows.
The manual is no help, can't find anything on 'tinternet, and I've lodged two requests for technical assistance with SMA in the last 2 weeks and heard nothing for them, which is a bit disappointing.
Hence the post here.
If anybody has experience setting up the "Grid management service" section on a Sunny boy 3.6 and would like to point me in the right direction, that would be very much appreciated.
Cheers
Uni
First post, so please be gentle.
I'm looking for a bit assistance on setting up a Sunny boy 3.6, specifically section 4 "Grid management service".
The system is a simple domestic install, a set of panels into the inverter and its tied to the grid. Nothing special.
This is the first time I've had to set one of these up, and I'll admit I'm a bit lost with some of the drop down options, as the screen shot below shows.
The manual is no help, can't find anything on 'tinternet, and I've lodged two requests for technical assistance with SMA in the last 2 weeks and heard nothing for them, which is a bit disappointing.
Hence the post here.
If anybody has experience setting up the "Grid management service" section on a Sunny boy 3.6 and would like to point me in the right direction, that would be very much appreciated.
Cheers
Uni