Just landed a 30k fire alarm system I have tendered for! Come on! Not bragging, chin up there is still work about......... ;)

 
No shortage of work here. November and December is always my busiest time of year. 3 new builds to first fix before the end of the year plus all my usual smaller jobs. In fact this year is heading to be my largest turnover and profit in my 7 years of self employment.

 
:Salute :Salute

:Salute

well done

just remember to use 3core and earth to interlink,

and make sure the 9v PP3 batteries are fairly new.
Can't use tw/e and use cpc for interlink after all they are double insulated.

Well done for getting contract.

 
Well done mate, as Prodave says very busy down at my end.

 
not bad for a fire alarm only job

expected contract length?

getting work is the easy part getting paid is another:innocent

 
Its a fire system in FP gold with Its own panel, smoke heads, sounders etc. All cable is to be p clipped 9 inches apart. Still 10 thousand meters should prove no trouble. Its in a new build and incredible cold lol ha ha ha. Around 600 devices.

 
Well done mate, as Prodave says very busy down at my end.
OCT/NOV/DEC will be largest quarterly turnover since i started 4 years ago

Jan is looking ok at the mo aswell.......

 
Have to agree, if I wasnt stopping I would have work well into the new year, and good quality as well.

 
I'm not sure an effective 2.2% (adjusted) is much of an incentive

I'm busy (in AV & Networks) but no one has mentioned VAT rise being the reason why they want work now

 