Surely not wiring through would involve the unnecessary use of extra JBs (or are we specifically talking about conduit wiring here)?have been pulled by inspectors about this subject many many years ago.i've either forgot why or never asked
and have always practiced it since
what regualtion if any would suggest not to wire through! ?
.
yes conduit job sorrySurely not wiring through would involve the unnecessary use of extra JBs (or are we specifically talking about conduit wiring here)?
+1Is that supposed to be conduit ? Nothing wrong with any of the methods that I can see . Can't see the point of the ticked method with the tee box and angle box above each socket.The left hand light switch and light fitting wiring passes through the Dist.Bd. So what, no big deaL .
What s wrong with the two sockets that are crossed out ? I do them like that all the time !!
I think you were talking to Mr Fussy Pants or his partner Mr Getalife .
Been there, done that! :C...a stupid plumber installing the cylinder with the elements already installed/wired but facing the wall at the back of the airing cupboard...
Enter your email address to join: