Single as opposed to multiple earth connections to neutral...So how else can a TNCS be delivered then?
Single as opposed to multiple earth connections to neutral...So how else can a TNCS be delivered then?
I never said TN-C-S was delivered in any other way.So how else can a TNCS be delivered then?
You haven;t even read up on supply types have you?Isn't that a PNB?Protective Nuetral Bond as on dedicated supply transformer supply
CNE is a systemIsn't that the cable they use in the supply network? Not a systemas it only applies to the External part, where as TN-C-S applies to the whole system
i.e.
TN = Tera (earthed Nuetral system)
C = Combined in the supply (CNE cble)
S = Seperate in the internal system
Enter your email address to join: