TP panel change

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Bet this was made before the reccesion wonder if there still as neat in today's financial climate

Looks good though

 
bet they cant do 2 in a day plus testing...
In my 21 years as a qualified spark, I've never heard any inspector ask how long a job took, however, I have heard them walk away from a job saying "wow that was a tidy job" resulting in the company getting a pat on the back and a reputation for quality work.

 
I especially like the way they have cable tied the phase conductors in the board - this will, of course, been allowed for in their design calcs .... grouping factor etc ....

 
pain in the arse for faultfinding? i thought i did a neat job but wow thats tidy. but at the end of the day, if your works tidy enough and you can do 2 a day to a high standard thats double the money! prioritys! :D no need to go overboard, unless its my house anyway :D

 
by the way is that a steel enclosure or plastic with the joints in? neutrals in different holes? mr eddy?

 
Looks well neat but would like to know how long it took. If you've got a lot of time to do a job you can spend time making it neat. I done a TP board change the other day and had half a day to strip the old one out and install the next. Plus point only 12 circuits and no testing. (done by others)

 
Top