Doing some work in a local shop. Shopkeeper had inspectio by council and fire officers,resulting in long list of things to fix.
I'been fitting key switches for testing the emergency lights, as well as a few other things.
He asked me to do a pir, but I dont think I'm competent yet. Agreed to have a look and point out any potential problems - all looks fairly good. Re wired and new cu 6 years ago.
However it's a tt system - I measured ze 50 ohm, so not bad- and it's a split load cu with 4 lighting circuits on non rcd side.
Is this ok? Comments please?
I'been fitting key switches for testing the emergency lights, as well as a few other things.
He asked me to do a pir, but I dont think I'm competent yet. Agreed to have a look and point out any potential problems - all looks fairly good. Re wired and new cu 6 years ago.
However it's a tt system - I measured ze 50 ohm, so not bad- and it's a split load cu with 4 lighting circuits on non rcd side.
Is this ok? Comments please?