Hi guys, ive been using this forum for a while as reference so i thought id post my latest query on here.
My parents asked me to update their cu to a new one as they are about to have the TT upgraded to PME, so i had a quick look and their is no water bonding. The mains water pipe is concreted under the kitchen units and the only thing showing is the tap style stop cock, the whole pipe is buried in the concrete (a jack of all trades built the extencion 25yrs ago)
My question is, where do i bond to as 600mm from the incoming cannot be achieved as its concreted in, and tracing the pipes to find the next nearest point involves removing the kitchen units (not an easy job in this kitchen).
Do i suffer it and remove the kitchen 5"to find the nearest point or is their an easier way?
Thanks
Tim
My parents asked me to update their cu to a new one as they are about to have the TT upgraded to PME, so i had a quick look and their is no water bonding. The mains water pipe is concreted under the kitchen units and the only thing showing is the tap style stop cock, the whole pipe is buried in the concrete (a jack of all trades built the extencion 25yrs ago)
My question is, where do i bond to as 600mm from the incoming cannot be achieved as its concreted in, and tracing the pipes to find the next nearest point involves removing the kitchen units (not an easy job in this kitchen).
Do i suffer it and remove the kitchen 5"to find the nearest point or is their an easier way?
Thanks
Tim