guys
next week I will be doing a PIR on one annex of a very large hotel. But as the DNO origin is in a switchroom next to the substation will I have to shut the whole hotel down to carry out the Ze test?? (600 rooms)
Can I call the origin at the point of entry into the annex im testing? (80 rooms) or can I just use the maximum values of Ze given by the DNO for any Zs calcs that maybe required
thanks