Hi guys
this install is overhead supply, TT with an voltage operated leakage breaker, the rod looks to be an old copper pipe and ra is around 600 ohms.
new cu fitted but i am struggling to get a rod in as there is a lot of concreate and i cant get one in a suitable place with a decent reading...