- Joined
- Feb 5, 2009
- Messages
- 5,612
- Reaction score
- 0
2392-10 : just off the press this is the New Sh
The earthing conductor and main protective bonding conductors should be connected to the Main Earthing Terminal.(42) Prospective Short Circuit Current is Measured at the Supply with the Main Earthing Conductor a) Connected to the Main Earth Terminal :
(B) Connected to the Neutral Supply :
© Disconnected from the Main Earth Terminal : *****
(d) Connected to the Line Supply :
I'm confused by this, I thought a Minor Works Certificate was only suitable for 'additions and alterations to an installation that do not extend to the provision of a new circuit'. (Quoted from Appendix 6 BS7671:2008).(48) The Electrical Certificate required to be completed for a domestic shower circuit would be : ( Remember this One a Must ) ↔↔↔
(a) A Minor Works Electrical Installation Certificate :
(B) A Minor Works Electrical Installation Certificate and a Schedule of Test Results :
© A Minor Works Electrical Installation Certificate and a Schedule of Inspections and a Schedule of Test Results : *****
(d) No Certification Required
(26) A shower located in a room above a bath would be : ( regs 701.512.2 (ii ) in zone 1
2392-10 : just off the press this is the New Sh
Enter your email address to join: