After virtualy completing my commercial job I was called back there last night to go over a few changes that need to be made....
When we first talked about the job the ovens were going to be 16A single phase (no hob)!!! When I got there lastnight the ovens were there,,,, 16A 3 phase:_| :_| :_| :_| :_| :_| :_|
The dishwasher was there,, previously told it would plug in,,, look at the data plate 5Kw... :_| :_| :_| :_|
Same thing with the waste disposal... :_| :_| :_| :_|
So now I have to disconnect 2 redundant single phase oven circuits and wire in 3 new 3 phase circuits and change/relocate one of the disconnected circuits for the dishwasher:_| :_| :_| :_|
And there is only 2 spare (single phase) spare right now so 3 in total:_| :_| :_| so I will now have to add a sub DB:_| :_| :_|
When we first talked about the job the ovens were going to be 16A single phase (no hob)!!! When I got there lastnight the ovens were there,,,, 16A 3 phase:_| :_| :_| :_| :_| :_| :_|
The dishwasher was there,, previously told it would plug in,,, look at the data plate 5Kw... :_| :_| :_| :_|
Same thing with the waste disposal... :_| :_| :_| :_|
So now I have to disconnect 2 redundant single phase oven circuits and wire in 3 new 3 phase circuits and change/relocate one of the disconnected circuits for the dishwasher:_| :_| :_| :_|
And there is only 2 spare (single phase) spare right now so 3 in total:_| :_| :_| so I will now have to add a sub DB:_| :_| :_|