Griffmaster
Member
- Joined
- Oct 22, 2016
- Messages
- 7
- Reaction score
- 0
Hi, could I ask for some advice please.
My main consumer unit has 2 banks of 8 MCB's (16 total) with an 80A RCCD for each bank.
My freezer is on one of the banks along with timed security lights, I have timed lights on both banks.
On a couple of ocassions when a lamp has popped, the RCCD for the bank along with the lamp MCB has tripped taking the freezer also.
Thought about fitting a supplementary garage CU for the freezer to overcome any future lamp popping issues.
Is this considered a reasonable idea and if so where best is the live feed for the supplementary CU to be taken from in the main CU?
Already have a garage type CU 63A RCD/1x16A MCB to hand.
Thanks.
My main consumer unit has 2 banks of 8 MCB's (16 total) with an 80A RCCD for each bank.
My freezer is on one of the banks along with timed security lights, I have timed lights on both banks.
On a couple of ocassions when a lamp has popped, the RCCD for the bank along with the lamp MCB has tripped taking the freezer also.
Thought about fitting a supplementary garage CU for the freezer to overcome any future lamp popping issues.
Is this considered a reasonable idea and if so where best is the live feed for the supplementary CU to be taken from in the main CU?
Already have a garage type CU 63A RCD/1x16A MCB to hand.
Thanks.