Afternoon all,
My apologies if this is simple one.
Here is the scenario,
The customer owns a very old pub/hotel circa 15th Century. Looking at some of it the place was wired very shortly after!
Main supply is to a 3 phase board, 100 A per phase. A sub main from this supply's the bar area amongst others. An old metal Wylex board. This is fed via a 16mm Twin and earth. At least I think it's 16mm.
This sub main has a further sub main from it to a small modern distribution board via 10mm T&E feeding the landlords accommodation area, electric shower @ 40A, 2 16A radials for sockets and 1 6A lighting cct. Shower is on a RCCD, rest is MCB's only.
The old metal Wylex, also supply's the 4 hotel rooms.
Here's the thing, the customer wants to install new electric shower in one room plus saniflo. This board is directly below that room. Can I Henly off the 16mm to a second board, with RCD etc to supply that room. It would require 50A for the shower, 20A radial for sockets and 6A lighting cct. The main supply is some way off and I can't get an earthing conductor back to it. Will I need to install rod for it's own earth? That would mean separate means of earthing for supply's to that room only. Is that possible?
Sorry it's such a long winded one but I'm struggling.
Thanks in anticipation,
Fitz
My apologies if this is simple one.
Here is the scenario,
The customer owns a very old pub/hotel circa 15th Century. Looking at some of it the place was wired very shortly after!
Main supply is to a 3 phase board, 100 A per phase. A sub main from this supply's the bar area amongst others. An old metal Wylex board. This is fed via a 16mm Twin and earth. At least I think it's 16mm.
This sub main has a further sub main from it to a small modern distribution board via 10mm T&E feeding the landlords accommodation area, electric shower @ 40A, 2 16A radials for sockets and 1 6A lighting cct. Shower is on a RCCD, rest is MCB's only.
The old metal Wylex, also supply's the 4 hotel rooms.
Here's the thing, the customer wants to install new electric shower in one room plus saniflo. This board is directly below that room. Can I Henly off the 16mm to a second board, with RCD etc to supply that room. It would require 50A for the shower, 20A radial for sockets and 6A lighting cct. The main supply is some way off and I can't get an earthing conductor back to it. Will I need to install rod for it's own earth? That would mean separate means of earthing for supply's to that room only. Is that possible?