Well the other half got fed up of waiting for me to do the work, so has got a few quotes in for plubming.....I've already purchased the sanitary ware/bath/showers.
old bathroom & hot tank are 3.4 meters away from new bathroom.....
Work required en-suite:
(i've already laid pipe work hep20)
connect shower
connect toilet
connect basin
connect waste
Work required new bathroom:
cap off all old pipework in old bathroom
fit new bath shower & sanitary ware.
fit soil pipework
install 3bar pump
old bathroom & hot tank are 3.4 meters away from new bathroom.....
Work required en-suite:
(i've already laid pipe work hep20)
connect shower
connect toilet
connect basin
connect waste
Work required new bathroom:
cap off all old pipework in old bathroom
fit new bath shower & sanitary ware.
fit soil pipework
install 3bar pump