the doctor
Part P Doctor ™
- Joined
- Mar 1, 2008
- Messages
- 580
- Reaction score
- 1
hi all
i have a new build wiring job to do at my sisters house in eire.
i could do with the info i need from any irish sparkies on here.....
i have heard ( up to now)
CU has to have single pole switch
CU has to have screw in main fuse
everything is rcd/rcbo protected
You cant sleeve switch wires brown, has to be twin brown
You cant sleeve three core, have to use twin brown and dpvc brown
You have to fit IP55 isolator in outside meter cabinet
so, is it all true and is there anything more i need to know? i am especially interested in sign offs and irish part p or whatever they call it
thanking you in anticipation
alan
i have a new build wiring job to do at my sisters house in eire.
i could do with the info i need from any irish sparkies on here.....
i have heard ( up to now)
CU has to have single pole switch
CU has to have screw in main fuse
everything is rcd/rcbo protected
You cant sleeve switch wires brown, has to be twin brown
You cant sleeve three core, have to use twin brown and dpvc brown
You have to fit IP55 isolator in outside meter cabinet
so, is it all true and is there anything more i need to know? i am especially interested in sign offs and irish part p or whatever they call it
thanking you in anticipation
alan