Morning all,
I'm trying to move a socket in my downstairs living room and run a spur from it over to an adjacent corner where there isn't any power at present.
The ground floor is a suspended floor, with a 3-4ft crawlspace under the floor. All the various spaces are accessible from the other, as there are access gaps in the brickwork. So you can currently pull the floorboards up to access the void under the floor, or you can use an access hatch installed in the front porch.
My problem is that the length of wire currently reaching the existing socket may not be enough to get it to the new location without the wire hanging in mid air (which I obviously don't want). I won't properly know until I start to move the socket, but when I do that I wanted to be prepared with a backup plan.
I was therefore wondering about using a junction box to extend the cable and also provide a split point for the new spur. I'm happy enough doing this from a practical point of view, but I wanted to see what your thoughts are on the accessibility of this as required by the regulations. The internet seems torn on the subject - could you let me know what you think, or if there is some other point I haven't considered?
Cheers,
John
I'm trying to move a socket in my downstairs living room and run a spur from it over to an adjacent corner where there isn't any power at present.
The ground floor is a suspended floor, with a 3-4ft crawlspace under the floor. All the various spaces are accessible from the other, as there are access gaps in the brickwork. So you can currently pull the floorboards up to access the void under the floor, or you can use an access hatch installed in the front porch.
My problem is that the length of wire currently reaching the existing socket may not be enough to get it to the new location without the wire hanging in mid air (which I obviously don't want). I won't properly know until I start to move the socket, but when I do that I wanted to be prepared with a backup plan.
I was therefore wondering about using a junction box to extend the cable and also provide a split point for the new spur. I'm happy enough doing this from a practical point of view, but I wanted to see what your thoughts are on the accessibility of this as required by the regulations. The internet seems torn on the subject - could you let me know what you think, or if there is some other point I haven't considered?