An old, second hand or temporarily not required:
100A TPN MCCB or switchfuse knocking around...
That I could "borrow" for 1 month??
The temp. kitchen I`m installing in the pub is drawing 89A/phase (maximum, I hoperayray), and I`ll need to protect the dist. circuit.
I can`t take it from the Hager TPN board, as they only go up to 63A in breakers; and I`d run the risk of overloading the board.
Once the new kitchen is up & running, I`ll have no use for the unit - I don`t really want the customer buying something he can`t use in future, if you know what I mean?
Thanks guys......
KME
100A TPN MCCB or switchfuse knocking around...
That I could "borrow" for 1 month??
The temp. kitchen I`m installing in the pub is drawing 89A/phase (maximum, I hoperayray), and I`ll need to protect the dist. circuit.
I can`t take it from the Hager TPN board, as they only go up to 63A in breakers; and I`d run the risk of overloading the board.
Once the new kitchen is up & running, I`ll have no use for the unit - I don`t really want the customer buying something he can`t use in future, if you know what I mean?
Thanks guys......
KME