While I wait for SSE to get back to me, has anybody got a rough estimate as to the cost of installing a second supply to a property in the Hampshire area?
The property concerned is currently supplied by overhead TT & customer is wanting half the house as a rental property.
He thinks he'll get away with a submain from existing supply to a submeter for the rented end of property.
Me I think it'll probably workout just as cost effective to get the 2nd supply in from the pole in the garden, seen as to do what the customer wants entails a 42mtr run of 16mm swa (through the smallest of crawl spaces in the loft) a 100a 100mA s type rcd + ocpd & labour.
It's all imaterial with the submain though I think the load will be an issue for the one service fuse what with 2x ovens + halogen hobs & the 3x 9.5kw showers & a small workshop + the 3 new 2kw panel heaters.
Anyway just thought somebody might have a rough idea as to the cost of a second supply.........see you all later off home via Threshers for a couple of Guiness Drink.
The property concerned is currently supplied by overhead TT & customer is wanting half the house as a rental property.
He thinks he'll get away with a submain from existing supply to a submeter for the rented end of property.
Me I think it'll probably workout just as cost effective to get the 2nd supply in from the pole in the garden, seen as to do what the customer wants entails a 42mtr run of 16mm swa (through the smallest of crawl spaces in the loft) a 100a 100mA s type rcd + ocpd & labour.
It's all imaterial with the submain though I think the load will be an issue for the one service fuse what with 2x ovens + halogen hobs & the 3x 9.5kw showers & a small workshop + the 3 new 2kw panel heaters.
Anyway just thought somebody might have a rough idea as to the cost of a second supply.........see you all later off home via Threshers for a couple of Guiness Drink.