That when installing 2.5 metres of 70mm 4 core SWA between two DBs, with a wall in the way, at night ; it would be advisable to have some really strong people (lots of `em) to put a bend in the cable, so you can dress it into the second gland !!!!!
Only took 2.5 hrs of the night - 6 hr shutdown which required:
1. Removal of old Dorman 8 way TPN
2. Run 10 metres of 25mm 4 core SWA from existing DB to location of new DB (2.5 metres up).
3. Install new 12 way DB.
4. Reinstate pre-existing circuits.
5. Terminate both SWAs to new DB
6. Get 70mm through wall, cut to length, dressed off, and into side of switchfuse.
7. Test & power back up before Chef & assistants arrive at 7.15 a.m.
:coffee coffee:yawn:z
Only took 2.5 hrs of the night - 6 hr shutdown which required:
1. Removal of old Dorman 8 way TPN
2. Run 10 metres of 25mm 4 core SWA from existing DB to location of new DB (2.5 metres up).
3. Install new 12 way DB.
4. Reinstate pre-existing circuits.
5. Terminate both SWAs to new DB
6. Get 70mm through wall, cut to length, dressed off, and into side of switchfuse.
7. Test & power back up before Chef & assistants arrive at 7.15 a.m.
:coffee coffee:yawn:z