ktguk
Senior Member
i was originally planning to go with a scheme provider after i completed a high spec kitchen(for the inlaws to be) and board change at home, that would do for the two jobs i thought. but now a rebuild of a large country house may have come along so i could do with part p a little sooner, so would a CU change at home and wiring my garage ( PVC conduit with IP rated switches close to door, swa feed from house etc decent job), would this be ok with them both being at same property