Ash
Senior Member
- Joined
- Feb 15, 2010
- Messages
- 350
- Reaction score
- 0
I'm still a student (don't shoot me please lol)
Me and a friend at college are installing power to a shed for his parents. We've been digging up the garden to lay the SWA cable but just before the shed there is a small line of bricks as a step. We seem to remember being told something about being allowed to run it along side the step which would save us a few hours of digging. Are we allowed to do this?
Me and a friend at college are installing power to a shed for his parents. We've been digging up the garden to lay the SWA cable but just before the shed there is a small line of bricks as a step. We seem to remember being told something about being allowed to run it along side the step which would save us a few hours of digging. Are we allowed to do this?