All's okay in my house except one cracked double socket that I must get around to replacing.
Built 8 years ago so split load CU with just 1 RCD, but that's fine as long as I don't want to do alterations to lighting circuits (I don't).
but (cough) there's a 13A socket in my airing cupboard (in the bathroom) That used to be an FCU for the immersion heater, but I swapped it for a socket while I'm working on my solar PV automatic dump load unit. Eventually when it's all finished and proven, I'll put it back to being an FCU, honest, I will. Well I certainly will before I sell the house, if I ever sell the house that is.
My previous house, a 1930's semi, I renovated over a period of about 5 years, doing it room by room. So in that one, for most of that period, I had at least one incomplete ring final, gradually being installed room by room as the renovations continued. And only when the last room on each floor was finished, did the two ends of the ring finally meet each other.