Got a job putting in power to a summer house, shed and hot tub.
Theres already a 6mm run in ready fro the summer house. The customer is suplying a 10mm from house db to the hot tub as they don't know what size hot tub they want yet. (but they want a big'n). I wont be digging out the trenches, just getting the cable into the house and connected and same with summer house.
So this job is to fit 4way db in summer house. Install 4 double sockets in there. A lattern light (they supply) with overide on the outside of the summer house. 2 lampposts (they supply) on decking on a weatherproof switch. From 4 way db, swa into shed next to summer house, 1 double socket, 1 bulkhead light spured off. Install weatherproof isolator for hottub which is going outside on the decking and obviously the work inside the house at the CU.
I'm supplying everything except the lights and the 2 supply cables, so all pvc conduit, outgoing swa, db etc
I've priced up all my gear out of the SF catalogue and it comes to 246quid.
I'm allowing 3days on the safe side at 150 per day so 450.
that totals 696. Does this sound about right? Do i need to add an percentage on to gear, or final cost to make sure? I know i may save some by getting the gear from the wholesalers, but SF is all i have to hand at the moment for prices.
cheers
Tom
Theres already a 6mm run in ready fro the summer house. The customer is suplying a 10mm from house db to the hot tub as they don't know what size hot tub they want yet. (but they want a big'n). I wont be digging out the trenches, just getting the cable into the house and connected and same with summer house.
So this job is to fit 4way db in summer house. Install 4 double sockets in there. A lattern light (they supply) with overide on the outside of the summer house. 2 lampposts (they supply) on decking on a weatherproof switch. From 4 way db, swa into shed next to summer house, 1 double socket, 1 bulkhead light spured off. Install weatherproof isolator for hottub which is going outside on the decking and obviously the work inside the house at the CU.
I'm supplying everything except the lights and the 2 supply cables, so all pvc conduit, outgoing swa, db etc
I've priced up all my gear out of the SF catalogue and it comes to 246quid.
I'm allowing 3days on the safe side at 150 per day so 450.
that totals 696. Does this sound about right? Do i need to add an percentage on to gear, or final cost to make sure? I know i may save some by getting the gear from the wholesalers, but SF is all i have to hand at the moment for prices.
cheers
Tom