Greetings to you all.
I am about to take my 2391 practical, tomorrow actually and Ive hit a brick wall..
Im pretty okay with everything (he says) except the RCD test.
Am I correct in thinking that the test is made across the phase on the RCD to CPC?
I have 3 leads, do I utilise the neutral or connect in to the CPC lead as in continuity testing?
My tester has an auto test function which tests at 50% 100% and 500% so almost everything is done for me.
Any help would be much appreciated.
I'll even buy the doughnuts!!
I am about to take my 2391 practical, tomorrow actually and Ive hit a brick wall..
Im pretty okay with everything (he says) except the RCD test.
Am I correct in thinking that the test is made across the phase on the RCD to CPC?
I have 3 leads, do I utilise the neutral or connect in to the CPC lead as in continuity testing?
My tester has an auto test function which tests at 50% 100% and 500% so almost everything is done for me.
Any help would be much appreciated.
I'll even buy the doughnuts!!