Ray4438
Well-known member
I am presently rewiring a single property into 2 houses.
To put you in the picture it was an folks home and the local council is turning it into 2 properties.
It has an PME TNCS supply and I contacted Scottish Power to put a supply to upstairs property aprox 10 meters away from exsiting head.
Was informed that I would have to dig a trench aprox 20m and the cost would be
To put you in the picture it was an folks home and the local council is turning it into 2 properties.
It has an PME TNCS supply and I contacted Scottish Power to put a supply to upstairs property aprox 10 meters away from exsiting head.
Was informed that I would have to dig a trench aprox 20m and the cost would be