I'm trying to work out the shortest cable run for the attached driveway lighting (excuse the ropey sketch!)
Lights are the green stars and as shown this needs 2 way switching. The distance between CU and 1st 2 way switch is negligible.
The shortest way I can think is
(1) 3 core (LNE) feed to 1st switch
(2) 4 core (2 x strappers, N, E) between switches (conduit method)
(3) 1 x 3 core from 2nd switch to remote light 50M away
(4) 1 x 3 core from 2nd switch back through all other lights
Giving longest run of approx 150M (2) + (4)
Or am I missing something?
Lights are the green stars and as shown this needs 2 way switching. The distance between CU and 1st 2 way switch is negligible.
The shortest way I can think is
(1) 3 core (LNE) feed to 1st switch
(2) 4 core (2 x strappers, N, E) between switches (conduit method)
(3) 1 x 3 core from 2nd switch to remote light 50M away
(4) 1 x 3 core from 2nd switch back through all other lights
Giving longest run of approx 150M (2) + (4)
Or am I missing something?