sparky999
Well-known member
- Joined
- Mar 24, 2008
- Messages
- 404
- Reaction score
- 0
Alright guys and gals,
Just wondering what you do when u have a 3 inch board in between the joists and a further 3 inch xtratherm board on top of the joists plus the boarding.
How do u make a hole so u get good space to fit an eyeball or tilt downlight.
On site for this company we have worked for a long while have got rid of the foreman and changed plasterers, we use to use spray paint so plaster can leave gap in these boards.
Got there 2 day and no hole left where the paint was sprayed so we have had to cut it all out 6 inch of it so its enough to fit the wings of lights in.
Just wondering what you do when u have a 3 inch board in between the joists and a further 3 inch xtratherm board on top of the joists plus the boarding.
How do u make a hole so u get good space to fit an eyeball or tilt downlight.
On site for this company we have worked for a long while have got rid of the foreman and changed plasterers, we use to use spray paint so plaster can leave gap in these boards.
Got there 2 day and no hole left where the paint was sprayed so we have had to cut it all out 6 inch of it so its enough to fit the wings of lights in.