Hi, I would be grateful for some advice on a project I am just about to undertake. I've been reading through lots (LOTS !!) of forums and am a tad confused as to where I stand on this so would be really grateful for 'plain English' advice !
I am just about to turn our summerhouse into an office / recording studio.
Currently I have a cable coming directly from my main fuse box with it's own RCD, running into a twin socket in the garage, from this socket there is armoured cable (6mm I think) running through the garage wall along to the Summerhouse, where its currently feed two double sockets and 1 wall light. (All of this was installed by a qualified spark and certified)
With the new Summerhouse set up I will require multiple sockets at least 20 plus heating & lights (prob led down lighters) I will have at least 2 pc's, approx. 7 monitors, A small studio mixer, and CDJ players (compact disc players), plus powered speakers and other general office stuff like Shredder, scanner phones etc etc.
My line of thought is to put in a small consumer unit into the Summerhouse and run the feeds off this internally through the studding before the Summerhouse is insulated and boarded. (I appreciate I don't need the CU in there but putting one in will make the wiring a lot easier to run for me because as it stand the current wiling is under the Summerhouse externally)
I am more than capable of doing this work myself and would be confident it would be safe (installation wise) My main concerns are
The draw on the feed if I had everything on at the same time (which is possible).
Do I need this modification certified If I do it myself
I am more than happy to call my usual spark back to do it but as always that will incur costs and what is already turning out to be a costly project.
I would be very grateful for any advice anyone can offer.
Many thanks
I am just about to turn our summerhouse into an office / recording studio.
Currently I have a cable coming directly from my main fuse box with it's own RCD, running into a twin socket in the garage, from this socket there is armoured cable (6mm I think) running through the garage wall along to the Summerhouse, where its currently feed two double sockets and 1 wall light. (All of this was installed by a qualified spark and certified)
With the new Summerhouse set up I will require multiple sockets at least 20 plus heating & lights (prob led down lighters) I will have at least 2 pc's, approx. 7 monitors, A small studio mixer, and CDJ players (compact disc players), plus powered speakers and other general office stuff like Shredder, scanner phones etc etc.
My line of thought is to put in a small consumer unit into the Summerhouse and run the feeds off this internally through the studding before the Summerhouse is insulated and boarded. (I appreciate I don't need the CU in there but putting one in will make the wiring a lot easier to run for me because as it stand the current wiling is under the Summerhouse externally)
I am more than capable of doing this work myself and would be confident it would be safe (installation wise) My main concerns are
The draw on the feed if I had everything on at the same time (which is possible).
Do I need this modification certified If I do it myself
I am more than happy to call my usual spark back to do it but as always that will incur costs and what is already turning out to be a costly project.
I would be very grateful for any advice anyone can offer.
Many thanks