- Joined
- Nov 28, 2009
- Messages
- 14,884
- Reaction score
- 1,071
not a job I am involved in but being discussed on another (not electrical) forum

The description of it is:
"The supply come into the box as a three phase cable head... each one supposed to be 100 amps... even though the supply is only two phase. So the buggers just fed the third 100 amp off the second live cable head.
This then feeds into the 9 way 'Bemco' DFB
9 separate 100 amp fuses are then available for each plot."
It's the supply for 9 holiday lodge plots in southern Scotland.
It's the use of Orange flex that gets me. Never seen anything like that before.
Apparently it was installed by these people http://www.iqagroup.co.uk/services/

The description of it is:
"The supply come into the box as a three phase cable head... each one supposed to be 100 amps... even though the supply is only two phase. So the buggers just fed the third 100 amp off the second live cable head.
This then feeds into the 9 way 'Bemco' DFB
9 separate 100 amp fuses are then available for each plot."
It's the supply for 9 holiday lodge plots in southern Scotland.
It's the use of Orange flex that gets me. Never seen anything like that before.
Apparently it was installed by these people http://www.iqagroup.co.uk/services/
Last edited by a moderator: