Hello, I'm after a pointer in the right direction in regards to building control. Over the coming months I will be undertaking a complete rewire of my own house and garage (including C.U replacement) as part of the properties renovation. I intend to carry out all of the installation work by myself. I consider myself to be competent to do this work due to my background in the aerospace industry (electrical/electronics). I have also taken my 18th edition and 2393-101 Certificate in the Building Regulations for Electrical Installations in Dwellings (Part P) exams.
Before starting, I made an application to my Local Authority to give notification of my intentions. I paid the fee including an extra fee for the inspection and testing. The LA have now come back to me and said I can start the work but they no longer provide this service and that I will need a Part P electrician to sign off my work.
I'm a little confused now as to the paperwork I will need to get in place.
1. I know that other electricians won't provide me with an EIC as I will have done the installation (totally get that). With my current qualifications, would it be acceptable to produce my own EIC?
2. Or, is it just a case of when I have completed the installation, call in and pay a Part P registered electrician to carry out a full EICR, and then submit that to the LA?
Any advice, other peoples experiences would be welcome on this.
Before starting, I made an application to my Local Authority to give notification of my intentions. I paid the fee including an extra fee for the inspection and testing. The LA have now come back to me and said I can start the work but they no longer provide this service and that I will need a Part P electrician to sign off my work.
I'm a little confused now as to the paperwork I will need to get in place.
1. I know that other electricians won't provide me with an EIC as I will have done the installation (totally get that). With my current qualifications, would it be acceptable to produce my own EIC?
2. Or, is it just a case of when I have completed the installation, call in and pay a Part P registered electrician to carry out a full EICR, and then submit that to the LA?
Any advice, other peoples experiences would be welcome on this.