gselectrical
Well-known member
- Joined
- Oct 13, 2009
- Messages
- 627
- Reaction score
- 0
I am in the process of installing an 80A 30mA RCD within an enclosure between the meter and CU. Current CU is an old wylex with plug in MCB's. I am also upgrading the bonding of the gas and water services.
Should a full EIC be issued for this work?
Cheers. J
Should a full EIC be issued for this work?
Cheers. J