Been testing a lot of domestic and commercial premises over the years. I usually give a price upon a visual inspection ect to get the general feel of how long it will take and what it will involve.
Now... i have been asked to give a price based on a per circuit bases. They have informed me there are 24cct on a 3 phase DB and1 sub CU with 10 ways. Just a general thought of how much to charge. i recon £25.00-30.00 Per cut??
Now... i have been asked to give a price based on a per circuit bases. They have informed me there are 24cct on a 3 phase DB and1 sub CU with 10 ways. Just a general thought of how much to charge. i recon £25.00-30.00 Per cut??