lilman
Well-known member
- Joined
- Jun 17, 2008
- Messages
- 209
- Reaction score
- 0
Evening all
Working at a property that will have immersion heated water storage tank; 2 immersions; 1 will be the main overnight immersion, and the other a 'boost' immersion that can be operated at any time of day. I can't get my head round what kind of controller(s) I will need. The off peak supply is via a seperate time-switch and off peak board, so the boost will need to be fed from the main consumer unit.
Working at a property that will have immersion heated water storage tank; 2 immersions; 1 will be the main overnight immersion, and the other a 'boost' immersion that can be operated at any time of day. I can't get my head round what kind of controller(s) I will need. The off peak supply is via a seperate time-switch and off peak board, so the boost will need to be fed from the main consumer unit.