Nidgeben
Member
Carrying out an EICR on a set of four blocks of flats I came across this DB that had been changed at some point and the person carrying it out had stripped out the old DB guts leaving the metal box and mounted the new one on a timber board over the top. I presume they thought this would be best as the installation is still partly1960's wiring so conduit earthing for many of the sub circuits. But in doing so they only left 100mm between the front cover and the wall as it tucked up above the door.
I have left this one to last so looking forward to tomorrow.
I have left this one to last so looking forward to tomorrow.